Customization: | Available |
---|---|
Production Continuity: | Continuous |
Condition: | New |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Latex Tube Assembly | Flow Regulator Assembly | Parts Drip Chamber Assembly |
No. | Station |
1 | Feed via vibrating drip chamber, manipulator grasp then put the positioning fixture |
2 | Feed via vibrating filter, punch rush into drip chamber |
3 | Punch the filter and drip chamber again and check if the filter is in place |
4 | Glue the drip chamber |
5 | Feed via vibrating spike, manipulator grasp then put the positioning fixture and assemble with drip chamber |
6 | Rotary positioning of air-vent on the spike |
7 | Punch the air-vent, manipulator grasp then assemble with spike |
8 | Examine the airvent inside the spike, whether there are bad membranes, such as partial membranes, broken membranes, leaky membranes, double membranes, etc. |
9 | Feed via vibrating air-vent cap, manipulator grasp and glue then assemble with spike |
10 | Punch the air-vent cap again ( Can add the flanging function of the blue air-vent cap) |
11 | Manipulator grasp spike then assemble with drip chamber |
12 | Punch the spike and drip chamber again |
13 | Feed via vibrating cover then assemble with spike |
14 | Finished product discharged/Unqualified product discharged |